You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Jalan Zamrud Kemayoran di Normalisasi
.
photo Rudi Hermawan - Beritajakarta.id

Water Channel on Jalan Zamrud Kemayoran Dredged

The 55 meter water channel on Jalan Zamrud, Kemayoran, Central Jakarta is dredged by Central Jakarta Sub-dept. of Water Management. The project is targeted to finish by the end of this month.

The project has been started since Wednesday (6/8) ago

Head Section of Maintenance for the agency, Boris Karlop Lumbangaol, admitted the effort is done since the channel can not function well because of blocked by dry mud.

“The project has been started since Wednesday (6/8) ago. It is hoped to complete in the next two weeks,” he said, Sunday (6/12).

30 Manhole Covers on Jl STM Walang Dismantled

His side deploys one mini excavator to ease sediment transport into the dump truck. “Mini excavator is deployed for three days,” he added.

According to him, the channel will be widened by 80 cm and deepened by 80 cm. His side deploys 18 personnel of the agency.

“Sheet pile installation has reached 15 meter out of 55 meter,” he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing